Resources

There's always something going on at North Ridge Pumps so stay up to date.

More Articles

Raw Water Intake Pumps for Process Cooling – Case Study

08 November 2022
For a recent client we chose to provide pumps that would harness raw water abstraction from an open body of water. But what is abstraction?
Read More
a08f454bde4a4f2a8ce99145c8dbac58.jpg

Booster Pumps for Seawater and Chlorine Dioxide BWTS System - Case Study

31 October 2022
Booster pumps are pumps designed to raise a pressure deemed to be too low within a process. This can be due to a process addition to a system, meaning the added equipment will not function as desired without a higher inlet pressure, or simply due to friction losses being higher than anticipated at design stage, when compared to installation, meaning system modifications are required.
Read More
adfc7905aee441cb849494c9f0610e51.jpg

Accelerating Cleaning, Safeguarding Results & Reducing Risk in Pilot Plants - Case Study

25 October 2022
Pilot plants are a smaller scale version of a newly designed production facility which are built for the testing of methods, procedures, ensuring the intended design produces the outcome or recipe they require and for proof of concept for investors before a much larger design is produced requiring heavy investment.
Read More
6cce452c41584e52932553e3262acbdd.jpg

Trialing and Scaling of Production for Start-Up's - Case Study

05 October 2022
Beginning production of a new formulation batch or innovative liquid product can often bring about difficulties.
Read More
d7f05858692445a19c1ea6eb36a8878b.jpg